Harku-Veskimetsa
Saksa, Isert
Saksa, Landau
Saksa, Ehlscheid
Saksa, Kandel
Saksa, Nunkirchen
Saksa, Deidesheim
2011
-
Aseri
Water main PE De110 L=359jm, PE De160 L=175, PE De63mm L=40jm installation by NO-DIG method
-
Jüri
Pipe PE De250mm L=70jm renovation by "cracking" method and PE De110mm L=112jm installation by NO-DIG method
-
Kõpu
Water main PE De110mm+PE De90mm L=456jm installation by NO-DIG method
-
Kose parish, Kose
Gravity pipeline PEDe160mm L=120jm, case PE De250 L=64jm, pressure pipeline PE De63 L=195jm installation by NO-DIG method
-
Kreutzwaldi str, Tartu city
Water main PE De160mm L=180jm installation by NO-DIG method
-
Loo
Water main PE De110mm installation by NO-DIG method L=212jm
-
Lõuna-Kohila
Gravity pipeline PVC 160mm installation by NO-DIG method L=332jm, gravity pipeline PE De315mm L=441jm installation by NO-DIG method
-
Maardu city, Muuga region
Pressure pipeline PE De315mm L=780jm, case PE De450mm L=128jm, steel case Dn400mm with PE De315mm L=64jm installation
-
Pärnu city
Electrical cable pipeline 4xPE De160mm L=188jm installation by NO-DIG method
-
Rakvere city
Steel case Dn200mm L=200jm, Dn250 L=23jm, Dn400m L=44jm installation by NO-DIG method
-
Saaremaa
Communication cable pipeline PE DN63mm L=124jm and PE DN110mm L=1013jm installation by NO-DIG method
-
Saku
Case Dn406mm installation L=85jm, water main PE De110mm L=779jm, PE De90mm L=119jm, PE De160mm L=253jm, PE De32mm L=58jm, installation by NO-DIG method
-
Saue-Vanamõisa
Pressure pipeline PE De110mm L=527jm, 2xPE DE110mm L=114jm installation by NO-DIG method
-
Sillamäe
Sewerage system PE De200mm renovation by "cracking" method L=184jm
-
Suure-Jaani parish under the Navesti river
Electrical cable pipeline PE De160mm installation by NO-DIG method L=131jm
-
Tallinn-Muuga
Water main PE De400mm reconstruction by NO-DIG method L=1113jm, PE De500mm L=84jm, case DN600mm for gravity pipeline DN500mm installation L=32jm by NO-DIG method.
-
Tallinn-Muuga, Altmetsa
Steel case Dn610mm L=61jm installation, water main PE De160 L=302jm, PE De110 L=521jm, PE De315mm L=109jm installation, pressure pipeline PE De400mm L=32jm installation by NO-DIG method
-
Tammi rd
PE DN250mm L=66jm case installation by NO-DIG method
-
Ülemiste junction 110 kV catenary replacement to underground cable
Cable pipline installation under the Tartu highway by NO-DIG method (rock ground) 3xPE Dn200+2XCu70mm2 L=120m Cable pipline installation at Järvevana rd. and under the railway by NO-DIG method 3xPE Dn200+2XCu70mm2 L=270m Entering into the Ülemiste substation by NO-DIG method 3xPE Dn200+2XCu70mm2 L=180m
-
Väljaküla-Antsla, Antsla city, Londi-Lusti
Communication cable pipeline PE De110mm L=1479jm installation by NO-DIG method
-
Varstu-Võru
Communication cable pipeline PE De110mm L=850jm installation by NO-DIG method
-
Veerenni 56, Tallinn
Water main renovation by "cracking" method L=80jm
-
Viljandi
Case 3xPE De160mm L=102jm installation by NO-DIG method
-
Võru
Steel case DN114mm L=905jm and communication cable pipeline PE De110mm L=692jm installation by NO-DIG method
-
Võru city
Pressure pipeline PE De110mm L=786jm installation by NO-DIG method
-
ул. Vabaõhumuuseumi 38-48, Tallinn
Communication cable pipeline Dn76mm installation by NO-DIG method L=225jm